Analys av verkstadsplaneringen : på Fläkt Woods i Jönköping

This paper is finishing part of the two-year master programme in Industrial Engineering and Management.Initially there was an inquiry of studying the queue-times that Fläkt Woods uses when they break down internal working orders. These times were assumed to be too generalised and does not apply to the actual value of the queue-times which generates incorrect data and delivery delays. During the work of this paper it has been established that it is not the queue-times that is the biggest problem. The problem is the shop floor control and the lack of manufacturing the right products at the right time. Therefore an analysis of the production planning process was made to bring forward the real problems.